Rose Cottage Lean To

It's been a while since it was first mentioned, but now that Rose Cottages lean to has been constructed I thought I'd share the process in photographs from the original to the end for all to see.

Benchmark contractors were the guys that we contracted into build the lean to, and I'm personally really pleased with the build. It even has a radiator in it to keep your boots warm in winter!

After the previous lean to was in disrepair (not even attached to the floor anymore and the door wouldn't shut!) it was decided that a new, bigger lean to needed to be built.

It took less than an hour to take down the old lean to, but thankfully a lot longer to build the new one!